Doha Metro

  • - Alignment of Rail tracks
  • - Building constructions.
  • Carried out a presurvey before commencing with the survey activity. All surveys were conducted to the standards and specifications laid out in the manual. Carried out day to day survey activities on site related to alignment of tracks and construction, provided survey data, comparisons and reports from site operations.

    • Geotechnical conditions, sub-surface profile and ground water conditions
    • Stiffness of the building and structure
    • Foundation type
    • Sensitivity and usage of the building and structure